
UV Coating PVC SPC Flooring Deep Embossed 100% Virgin Material Fortovan Band
Contact Person : Anny Zhang
Phone Number : 86-371-55365987
Minimum Order Quantity : | 3000 Square Meter | Packaging Details : | Cartons and pallets according to different size.Generally, 2000-4200 square meter per 20 GP |
---|---|---|---|
Delivery Time : | 25-30 work days | Payment Terms : | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability : | 2500 Square Meter per day |
Place of Origin: | China | Brand Name: | Fortovan |
---|---|---|---|
Certification: | CE / SGS / ISO9001 | Model Number: | SPC-1920039 |
Detail Information |
|||
Product Type: | SPC Flooring | Advantages: | Easy To Install / Labor Costs Saving |
---|---|---|---|
Wearlayer: | 0.3mm/0.5mm | Design Style: | Modern |
Surface: | UV Coating Layer | After-sale Service: | Online Technical Support |
Type: | Plastic Flooring | Certificate: | CE / SGS / ISO9001/ISO14001 |
Surface Treatment:: | Parquet, Wood Grain | OEM: | Acceptable |
High Light: | Wood Grain SPC Vinyl Flooring,UV Coating SPC Vinyl Flooring |
Product Description
Wooden Design SPC WPC Vinyl Click Floor
Safety Criteria | Standard | Value |
Flammability | EN13501-1 | Bf1 |
Slip Resistance | EN13893 | DS |
Formaldehyde Emission | EN717-1 | None |
Castor Wheel Test | EN425 | Pass |
Color Fastness | ISO105-BO2 | ≥6 |
Determination of Migration of Heavy Metals | EN71 | None |
Performance | Standard | Value |
Wear Resistance | EN-660-2 | ≤0.015g |
Flexibility | EN435 | No damage |
Curling After Exposure To heat | EN434 | ≤1.2mm(80ºC,6hrs) |
Peel Resistance | EN431 | ≥2.8Kgf/cm2 |
Dimensional Stability | EN434 | ≤0.08%(80ºC,6hrs) |
Residual Indentation | EN434 | ≤0.1mm |
Product Description:
1. UV Coating: Protects the product and enables easy cleaning and care.
2. Wear Layer: Guarantee very high durability and is the basis for the classification in the corresponding application areas.
3. Decor Film: Gives the product a unique design.
4. SPC Core: Provides elasticity and stability.
5. Click System: Easy and fast installation, no need glue.
FAQ:
Q1. What is your terms of packing?
A: Generally, we pack our goods in standard. If you have other requirement, we will also try our best to serve you.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance. Or you can pay through Alibaba Trade Insurance. L/C and western union is also accepted.
Q3. What is your terms of delivery?
A: FOB, CFR, CIF,EXW
Q4. How about your delivery time?
A: Generally, it will take 15 to 30 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q7: How do you make our business long-term and good relationship?
A:We keep good quality and competitive price to ensure our customers benefit. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
Enter Your Message